| SECTION .0100 |
GENERAL PROVISIONS |
| SECTION .0200 |
PERMITS FOR SOLID WASTE FACILITIES |
| SECTION .0300 |
TREATMENT AND PROCESSING FACILITIES |
| SECTION .0400 |
TRANSFER FACILITIES |
| SECTION .0500 |
DISPOSAL SITES |
|
|
|
|
APPROVED DISPOSAL METHODS |
|
|
OPEN DUMPS |
|
|
SITING AND DESIGN REQUIREMENTS FOR
DISPOSAL SITES |
|
|
APPLICATION REQUIREMENTS FOR
SANITARY LANDFILLS |
|
|
OPERATIONAL REQUIREMENTS FOR
SANITARY LANDFILLS |
|
|
REPEALED |
|
|
APPLICATION REQUIREMENTS FOR
INCINERATORS |
|
|
OPERATIONAL REQUIREMENTS FOR
INCINERATORS |
|
|
CLOSURE CONDITIONS |
|
|
RESERVED FOR FUTURE CODIFICATION |
|
|
PURPOSE, SCOPE, AND APPLICABILITY
FOR CONSTRUCTION AND DEMOLITION LANDFILLS |
|
|
DEFINITIONS FOR C&DLF FACILITIES |
|
|
GENERAL APPLICATION REQUIREMENTS AND
PROCESSING FOR C&DLF FACILITIES |
|
|
GENERAL REQUIREMENTS FOR C&DLF
FACILITIES AND UNITS |
|
|
APPLICATION REQUIREMENTS FOR C&DLF
FACILITIES |
|
|
SITE STUDY FOR C&DLF FACILITIES |
|
|
FACILITY PLAN FOR C&DLFS |
|
|
GEOLOGIC AND HYDROGEOLOGIC
INVESTIGATIONS FOR C&DLF FACILITIES |
|
|
ENGINEERING PLAN FOR C&DLF
FACILITIES |
|
|
CONSTRUCTION REQUIREMENTS FOR C&DLF
FACILITIES |
|
|
CONSTRUCTION QUALITY ASSURANCE FOR
C&DLF FACILITIES |
|
|
OPERATION PLAN AND REQUIREMENTS FOR
C&DLF FACILITIES |
|
|
CLOSURE AND POST-CLOSURE
REQUIREMENTS FOR C&DLF FACILITIES |
|
|
MONITORING PLANS AND REQUIREMENTS
FOR C&DLF FACILITIES |
|
|
ASSESSMENT AND CORRECTIVE ACTION
PROGRAM FOR C&DLF FACILITIES AND UNITS |
|
|
FINANCIAL ASSURANCE REQUIREMENTS FOR
C&DLF FACILITIES AND UNITS |
|
|
EXISTING C&DLF UNITS AS OF JANUARY
1, 2007 |
|
|
RESERVED FOR FUTURE CODIFICATION |
|
|
LAND CLEARING AND INERT DEBRIS
(LCID) LANDFILLS |
|
|
RESERVED FOR FUTURE CODIFICATION |
|
|
BENEFICIAL FILL |
|
|
APPLICABILITY REQ. FOR LAND
CLEARING/INERT DEBRIS (LCID) LANDFILLS |
|
|
SITING CRITERIA FOR LAND CLEARING
AND INERT DEBRIS (LCID) LANDFILLS |
|
|
APPLICATION REQUIREMENTS FOR LAND
CLEARING/INERT DEBRIS (LCID) LANDFILLS |
|
|
OPERATIONAL REQ. FOR LAND
CLEARING/INERT DEBRIS (LCID) LANDFILLS |
| SECTION .0600 |
MONITORING REQUIREMENTS |
| SECTION .0700 |
ADMINISTRATIVE PENALTY PROCEDURES |
| SECTION .0800 |
SEPTAGE MANAGEMENT |
| SECTION .0900 |
YARD WASTE FACILITIES |
| SECTION .1000 |
SOLID WASTE MANAGEMENT LOAN PROGRAM |
| SECTION .1100 |
SCRAP TIRE MANAGEMENT |
| SECTION .1200 |
MEDICAL WASTE MANAGEMENT |
| SECTION .1300 |
DISPOSITION OF REMAINS OF TERMINATED
PREGNANCIES |
| SECTION .1400 |
MUNICIPAL SOLID WASTE (SW) COMPOST
FACILITIES |
| SECTION .1500 |
STANDARDS FOR SPECIAL TAX TREATMENT
OF RECYCLING AND RESOURCE RECOVERY EQUIPMENT AND FACILITIES |
| SECTION .1600 |
REQUIREMENTS FOR MUNICIPAL SOLID
WASTE LANDFILL FACILITIES (MSWLF's) |
|
|
|
|
Purpose, Scope, and Applicability |
|
|
Definitions |
|
|
General Application Requirements
and Processing |
|
|
General Requirements For MSW
Facilities |
|
|
Reserved for Future Codification |
|
|
Application Requirements For MSW
Facilities |
|
|
Site Study for MSWLF Facilities |
|
|
Facility Plan |
|
|
Engineering Plan |
|
|
Construction Quality Assurance Plan |
|
|
Location Restrictions for MSWLF
Facility Siting |
|
|
Geologic and Hydrogeologic
Investigations For MSWLF Facilities |
|
|
Construction Requirements For MSWLF
Facilities |
|
|
Operation Plan For MSWLF |
|
|
Operational Requirements For MSWLF
Facilities |
|
|
Closure and Post Closure
Requirements For MSWLF Facilities |
|
|
Financial Assurance Rule |
|
|
Closure and Post Closure Plan |
|
|
Applicability of Ground-water
Monitoring Requirements |
|
|
Ground-water Monitoring Systems |
|
|
Groundwater Sampling and Analysis
Requirements |
|
|
Detection Monitoring Program |
|
|
Assessment Monitoring Program |
|
|
Assessment of Corrective Measures |
|
|
Selection of Remedy |
|
|
Implementation of the Corrective
Action Program |
|
|
Reserved for Future Codification |
|
|
Leachate Storage Requirements |
| SECTION .1700 |
REQUIREMENTS FOR BENEFICIAL USE OF
COAL COMBUSTION BY-PRODUCTS |