This Rule contains the information required for a permit application for each treatment and processing facility. A minimum of three sets of the following information shall be required in each application:
(2) An approval letter from the unit of local government having zoning authority over the area where the facility is to be located, stating that the proposed facility meets all of the requirements of the local zoning ordinance, or that the site is not zoned; and
(3) Any other information pertinent to the proposed facility.
.0302 OPERATIONAL REQUIREMENTS
Any person who maintains or operates a treatment and processing facility shall maintain and operate the facility in accordance with the following practices unless otherwise specified in the permit:
(2) A facility shall only accept wastes which it is permitted to receive;
(3) Water that comes in contact with solid waste will be contained on-site or properly treated prior to discharge from the site. A NPDES permit may be required prior to discharge to surface waters;
(4) Equipment for fire control shall be available;
(5) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin;
(6) Equipment shall be provided in the storage and charging areas and elsewhere as needed or as may be required in order to maintain the facility in a sanitary condition; and
(7) Appropriate methods shall be provided to confine material subject to be blown by the wind within the area. At the conclusion of each day of operation, all windblown material resulting from the operation shall be collected and returned to the area by the owner or operator.