
|
Responsible Party |
Facility Name |
Violation(s) |
Penalty Amount |
Date Assessed |
|
Kurz Transfer
Products, LP Mecklenburg Co. |
Kurz Transfer
Products Davidson Co. |
Violation of 15A NCAC 2N .0302 by failing to provide corrosion protection for two steel underground piping systems; and violation of 15A NCAC 2N .0503 by failing to provide secondary containment for two hazardous substance USTs and associated piping systems. |
$11,818.87 |
4/9/07 |
|
Ram Marketing, Inc. Wilkes Co. |
U Filler Up Catawba Co. |
Violation of 15A NCAC 2N .0302 by failing to provide spill prevention for five UST systems; violation of 15A NCAC 2N .0402 by failing to operate and maintain a corrosion protection system for five UST systems, by failing to have a qualified corrosion protection tester evaluate a cathodic protection system at least once every three years, and by failing to inspect a cathodic protection system every sixty days; violation of 15A NCAC 2N .0502 and.0506 by failing to comply with leak detection requirements for five USTs , three pressurized piping systems, and two suction piping systems; and violation of 15A NCAC 2N .0505 by failing to conduct an annual test of the operation of three ALLDs associated with three pressurized piping systems. |
$16,279.20 |
4/9/07 |
|
Kyle's Friendly
Service, Inc. Guilford Co. |
Hwy 29 BP Guilford Co. |
Violation of NCGS 143-215.94U by placing petroleum products into USTs at a facility for which it did not hold a valid operating permit. |
$4,691.12 |
4/18/07 |
|
Marshall Oil
Group, LLC Wake Co. |
Hopedale Market 384 Alamance Co. |
Violation of 15A NCAC 2N .0801 by failing to secure and maintain five UST systems in temporary closure. |
$5,446.16 |
4/30/07 |
|
Douglas Allen
Haneline Iredell Co. |
Haneline Country
Store Iredell Co. |
Violation of 15A NCAC 2N .0302 by failing to ensure the integrity of three UST systems prior to installing corrosion protection, violation of 15A NCAC 2N. 0402 by failing to operate and maintain a corrosion protection system to continuously provide corrosion protection for three UST systems, violation of 15A NCAC 2N .0502 and .0506 by failing to comply with leak detection requirements for three USTs, and violation of 15A NCAC 2N .0801 by failing to secure and maintain three UST systems in temporary closure. |
$15,346.07 |
4/18/07 |
|
Quality Oil Company Richmond Co. |
Otuel's Food-N-Fuel Richmond Co. |
Violation of 15A NCAC 2N .0302 and .0402 by failing to comply with corrosion protection requirements for five UST systems, violation of 15A NCAC 2N .0302 by failing to comply with corrosion protection requirements for metal flexible connectors and ancillary equipment for five piping systems, violation of 15A NCAC 2N .0502 by failing to meet leak detection requirements for one suction piping system, and violation of 15A NCAC 2N .0601 an .0603 by failing to report and investigate a suspected release. |
$11,831.40 |
4/23/07 |